$1100 for are of land
We plan a trip to the plot, make an agreement and give you ownership rights for a plot. All the members of the cooperative invest in the road and electrical substation.
Less than 150 m2 — $5900
- Project team and Client visit the plot together
- Joint strategic session defining the Client’s needs and approval of the technical part of the project (less than 14 days)
- Development of the architectural concept: thoughtful planning of the house according to all the wishes and functions
- Zoning of the territory. Possible ways of development and steps
Selection of facade materials
Starting at $26 for m2. The final price is determined after the approval of the sketch project.
- Visiting the plot and creating the foundations of the building
- Analysis and approval of construction technology, construction of foundations and engineering networks. Final approval of window specifications.
- Meeting on selection and approval of facade materials
- Development and issuance of working drawings for the stages “Working Architecture” and “Building Structures”
Starting at $30 for m2. The final price is determined after the approval of the sketch project.
- Analysis of working drawings and building structures project
- Strategic session defining needs and desires of the Client
- Interior design
- Presentation with photorealistic visualization
- Meeting with the Client on the selection of materials by examples
- Two meetings with the Client on the changes to the project
17% of the total cost of the project
- Selection of contractors, signing of contracts and agreements with contractors and planning of their work. Settlement with contractors.
- Coordinating estimates with the client
- Control of contractors’ work, quality of it, cost and timing of construction
- Supervision, We control the conformity of construction to the drawings
- Architectural project support, recommendations and clarification on construction joints for optimization and better solutions
- Materials selection and prices analysis
- Control of procurement of materials and their quality
- Finalization of the work performed